SOME OF THE MAJOR PROJECTS HANDLED
BY US IN THE PAST ARE |
1 |
Civil / Structural /
Architectural Design / Project management work for Green field Project for M/s.Sterlite
Industries (I) Ltd, 60,000 TPA copper Refinery Plant at Silvassa. |
2 |
Civil / Structural /
Architectural Design / Project management work for The liquid paint plant at Sikandrabad
for M/s.Jenson& Nicholson Ltd. |
3 |
Design / Drawing work for
expansion of Copper refinery plant at Silvassa for M/s.Sterlite Industries (I) Ltd,
from 60,000 TPA to 100,000 TPA |
4 |
Design & drawing work for
expansion of Continuous Copper Rod plant for M/s.Sterlite Industries (I) Ltd
at Silvassa. |
5 |
Design / drawing / Layout &
planning work for Land Acquisition maps for the proposed Aluminium Plant at Jharsuguda for
M/s.Sterlite Industries (I) Ltd. |
6 |
Structural Safety Survey /
residual life analysis, (including remedial measures) for the 6.0 T ship unloader
structure for M/s.Coromandel fertilisers Ltd - Visakhapatnam. |
7 |
Stability analysis / safety
Survey (using finite Element Analysis Method), of the 63m tall Steel F.A.T chimney at the
Sulphuric Acid plant for M.S.Coromandel Fertilisers Ltd - Visakhapatnam. |
8 |
Stability analysis / safety
survey of the 40m Tall F.A.T stack & the main Sulphuric Acid converter at the
Sulphuric Acid plant for M/s.Hind Lever Chemicals Ltd - Haldia. |
9 |
Safety survey / Stability
analysis (Using Finite Element Method) for the main Sulphuric Acid Converter, Inter-pass
Absorption Tower, and Sulphuric Acid Storage tanks at the Sulphuric Acid Plant for M/s.Hindustan
Zinc Ltd, - Debari Zinc Smelter, Udaipur. |
10 |
Structural safety Survey,
including suggested remedial measures, of structures damaged / overstressed due to
vibration for all the Units of Chanderia Lead-Zinc Smelter at Chittorgarh for M/s.Hindustan
Zinc Ltd. |
11 |
Revamping of all structures
damaged due to corrosion by acid in all the units of Debari Zinc Smelter at Udaipur, for M/s.
Hindustan Zinc Ltd. |
12 |
Safety survey & revamping of
all structures for the Lead, and Zinc Circuits at Visakhapatnam Lead Zinc Smelter for M/s.Hindustan
Zinc Ltd. |
13 |
Design / drawing work for 800 Tonne capacity Fine coal silo,
& raw coal silo of the Coal Dust Injection plant for Bokaro & Bhilai Steel Plants
for Steel Authority of India Ltd. |
14 |
Structural Safety Survey /
remedial measures for revamping the damaged structures for the coal washery plant at
Jamadoba, Dhanbad for M/s.TISCO. |
15 |
Modification of the support
arrangement of the furnace & boiler at the power plant for the Colliery at West-Bokaro
for M/s.TISCO. |
16 |
Design / Drawing & site
supervision for the Mechanical / Civil / Structural Work involved in installation of Bag
filter at Lead smelter, Tundoo for Hindustan Zinc Ltd. |
17 |
Structural Safety Survey for the 6.0 T ship unloader structure
for M/s.Coromandel fertilisers Ltd - Visakhapatnam.
|